Requests for Proposals/Bids

Parties interested in bidding on City projects should contact the Engineering Office at 316-284-6020 to be added to the bidders list. If a contractor has not placed any bids over a reasonable period of time, then the City may request a resubmission from that contractor.

2025

RFQ Safe Streets for All (SS4A) Action Planning

Work: Professional services to assist the City in developing Safety Action Plans for the SS4A grant program and administering the federal grant.

Closes: noon Aug. 6, 2025

Safe Streets 4 All RFQ(PDF, 890KB)

Building Demolition at 320 N. Main

Work: Demolish building materials at 320 N. Main, Newton, KS; and remove and dispose of building materials and special waste.

Closes: 10:30 a.m. July 31, 2025

320 N. Main Demolition(PDF, 1MB)

Annual Overlay Program 2025

Work: Approximately 15,553 SY of asphalt milling and overlay of 2,212 tons of asphaltic concrete in the southeast portion of Newton for the base bid plus possible add alternates totaling 6,467 SY milling and overlay of 1,242 tons of asphaltic concrete.

Closes: 11:00 a.m. May 1, 2025

Annual Overlay Program 2025(PDF, 1MB)

Airport Runway 8-26 Reconstruction (Re-bid)

Work: Reconstruct Runway 8-26 at Newton City/County Airport. Included are a Base Bid with one Bid Alternate. Bid Alternate 1 consists of the airfield electrical scope.

Closes: 11 a.m. April 10, 2025

Airport Runway 8-26 Reconstruction (Re-bid)(PDF, 114KB)

12th Street Mill and Overlay

Work: Mill and overlay along 12th Street from K-15 (Main Street) to Pine Street including 3642 SY Milling, 323 ton HMA Pavement, 1039 SY 8" Reinforced Concrete Pavement Patching, and related appurtenances in Newton.

Closes: 11:00 a.m. April 3, 2025

12th Street Mill and Overlay(PDF, 406KB)

Airport Runway 8-26 Reconstruction

Work: Reconstruct Runway 8-26 at Newton City/County Airport. Included are a Base Bid with one Bid Alternate. Bid Alternate 1 consists of the airfield electrical scope.

Closes: 11 a.m. March 11, 2025

Airport Runway 8-26 Reconstruction(PDF, 114KB)

Comprehensive Plan

Work: Provide professional services to develop a 10-year Comprehensive Plan with the objective of providing the City Commission, Planning Commission, City staff, City residents, and the business community with a compelling vision and plan used to guide decision-making and development.

Closes: 5 p.m. April 1, 2025

Comprehensive Plan(PDF, 676KB)

S Hillside Road Paving Improvement - SE 12th to E 1st Street

Work: Construct approximately 23,541 SY Concrete Pavement, 1164 LF SWS Pipe, and related appurtenances on the east side of Newton.

Closes: 11:30 a.m. February 6, 2025

S Hillside Road Paving(PDF, 1MB)

2024

Quail Creek Ave Paving Extension - Phase 1

Work: Construct approximately 650 LF Curb & Gutter, 1532 SY Reinforced Concrete Pavement, 335 SY Sidewalk 3 SWS Inlets, 237 LF SWS Pipe, and related appurtenances on the west side of S Kansas Avenue in Newton.

Closes: 11:00 a.m. December 17, 2024

Quail Creek Ave Paving Extension - Phase 1(PDF, 881KB)

NDV Plaza - Waterline Extension

Work: Construct approximately 1153 LF of 8" waterline, 3 Fire Hydrant Assemblies, and related appurtenances on S Kansas Avenue in Newton.

Closes: 11:00 a.m. October 15, 2024

NDV Plaza - Waterline Extension(PDF, 1MB)

Spencer Road Reconstruction - SE 14th to E 1st Street

Work: Reconstruction of approximately 22,394 SY of pavement on Spencer Road from SE 14th St. to E 1st St. in Newton.

Closes: 1:30 p.m. October 1, 2024

Spencer Road Reconstruction - SE 14th to E 1st Street(PDF, 2MB)

Compensation & Classification Study

Work: Analyze the existing classification system and develop suitable, industry-recognized classification specifications; conduct a market study, evaluate compensation adjustments, and develop cost estimates for implementation. 

Closes: 5 p.m. Sept. 27, 2024

Compensation & Classification Study(PDF, 596KB)

Police Training Facility

Work: Reconstruction of the existing building at 214 E. 6th St., Newton, KS, for use by the Newton Police Department as a training facility. 

Closes: 11 a.m. July 11, 2024

Annual Overlay Program 2024

Work: Approximately 11,224 SY of asphalt milling and overlay of 1,523 tons of asphaltic concrete in the southern portion of Newton for the base bid plus add alternates for two parking lots as well as SE 14th St.

Closes: 11 a.m. April 18, 2024

Annual Overlay Program 2024(PDF, 816KB)

1st and Spencer Traffic Signal

Work: Improvements of the intersection of 1st Street and Spencer Road including traffic signals, 162 SY subgrade, 268 LF curb & gutter, 81 SY concrete pavement, 58 SY concrete sidewalk, and related appurtenances.

Closes: 11 a.m. March 7, 2024

1st and Spencer Traffic Signal(PDF, 548KB)

Proposal for Fischer Field Artificial Turf

Work: Proposal for removal of existing turf, regrading of subgrade, repair of drainage system, supplying and replacement of new artificial turf.

Closes: 4 p.m. February 22, 2024

Proposal for Fischer Field Artificial Turf(PDF, 360KB)

Country Club Lift Station Rehabilitation

Work: Rehabilitation of the existing country club lift station including full replacement of the pumps and piping, lining of the existing wet well, new generator, and site improvements along Country Club Drive in Newton, KS.

Closes: 11 a.m. February 22, 2024

Country Club Lift Station Rehabilitation(PDF, 637KB)

Cow Palace Road Sanitary Sewer Extension

Work: Approximately 1,700 LF 12” Sanitary Sewer Pipe, 8 sanitary sewer manholes, and related appurtenances along Cow Palace Road in Newton, KS.

Closes: 11 a.m. January 18, 2024

Cow Palace Road Sanitary Sewer Extension(PDF, 609KB)

Proposal for Construction of Park Maintenance Building

Work: Proposal for construction of the Park Maintenance Building which includes an enclosed 60' x 90' metal building with concrete footings and concrete slab, as specified.

Closes: 12 p.m. January 26, 2024

Proposal for Construction of Park Maintenance Building(PDF, 356KB)