ul graphicur graphic
Newton Logo

1100 S Kansas Ave
PO Box 426
Newton, KS
67114

Phone: 316.284.6080
Fax: 316.284.6073

iul graphic

WASTE WATER DIVISION

MISSION

Provide an environmentally sound wastewater collection and treatment system in compliance with state and federal regulations.

WASTE WATER COLLECTION

Four full-time employees staff the wastewater collection operations, which maintain more than 100 miles of wastewater lines and eight lift stations.

WASTE WATER COLLECTION EMPLOYEES:
  • Repair and replace broken sewer mainlines.
  • High pressure jet clean the entire collection system annually.
  • Televise 1/3 of the sewer lines annually.
  • Plan for solutions to inflow/infiltration problems.
  • Check and maintain eight lift stations twice weekly.
  • Respond to backup reports.
  • Repair manholes.
  • Have two employees on call for 24-hour service.
  • Perform utility locates.
TRAINING AND CERTIFICATIONS

Wastewater collection has two certified State of Kansas operators, including one class IV wastewater certified operator and one class II wastewater certified operator. Certified operators requirements include 10 hours of certified training by a KDHE certified school per year. All of the employees in wastewater collection are certified in confined space and trenching and shoring and participate in monthly safety training.

Photo wastewater be treated with ultraviolet light

WASTE WATER TREATMENT

Five full-time employees staff the wastewater treatment operations. They are responsible for cleaning up wastewater to meet Kansas Department of Health and Environment requirements. The clean water is then released into a receiving stream, Slate Creek, which enters into Sand Creek.

Photo treated wastewater enters Slate Creek

WASTE WATER TREATMENT EMPLOYEES:
  • Collect influent and effluent samples daily.
  • Analyze samples in lab for BOD, TSS, ammonia, fecal coliform.
  • Operate plant and make adjustments using lab information.
  • Maintain facility grounds.
  • Maintain pumps and motors through monthly preventative maintenance program.
  • Monitor plant 24 hours a day through SCADA system.
  • Maintain and clean facility buildings.
  • Haul and spread sludge on city-owned farm land.
  • Submit monthly monitoring report to state.
TRAINING CERTIFICATIONS

Wastewater treatment has four certified State of Kansas operators, including one class IV wastewater certified operator, one class III wastewater certified operator and two class II wastewater certified operators. The class IV operator is also a certified class I laboratory operator. All of the wastewater treatment employees are also certified in confined space and trenching and shoring and participate in monthly safety training.


Automatic Bill Payment

By signing up for our automatic bill payment plan, your monthly utility bill will automatically be deducted from the checking or savings account of your choice on the due date. You will eliminate the need to write a check every month, purchase stamps, and make trips to the mailbox. Once enrolled, you'll never have to worry about paying your bill because everything is taken care of automatically.

City Utility Fees @ Information Sheet

Newton Water Quality Report

EMAILill graphic
corner graphiclr graphic